AGP Picks
View all

New RADR warehouses strengthen 31 FW airfield damage repair capabilities, enhance mission readiness

News originally published by

DVIDS - Georgia

AVIANO AIR BASE, Italy — The 31st Fighter Wing is strengthening its ability to respond to airfield damage with the completion of two new warehouses designed to support rapid airfield damage repair operations at Aviano Air Base, Italy.

The facilities provide dedicated storage for equipment and materials used to restore an airfield following damage, including skid steers, dump trucks, asphalt recyclers and other heavy equipment required for recovery operations.

Previously, much of the equipment and material was stored in large shipping containers outdoors in Area C, a six-minute drive from Area F where the flight line is located. The new warehouses provide a centralized, protected location where 31st Civil Engineering Squadron Airmen can organize, maintain and access resources more efficiently.

“RADR is a full on operation,” said U.S. Air Force Master Sgt. Ramon Aarons, 31st CES engineering flight superintendent. “There’s warehouse procedures, which account for the material and everything that’s needed for repairs, followed by the execution on the airfield.”

The new warehouses protect materials with shelf-life requirements and items that cannot be exposed to the elements, while also improving the process of locating and transporting resources during an emergency. Together, they provide approximately 64,121 square feet of warehousing space and are positioned near the airfield to help minimize delays. Their locations also provide resource dispersal, allowing equipment and materials to be divided between multiple sites rather than concentrated in a single location.

“If that side of the airfield gets hit and we cannot access that warehouse, we have another one to rely on,” said Aarons.

The project was awarded in 2023 through European Deterrence Initiative funding and included approximately $26.5 million for the two facilities. Construction began in 2023 and was completed in 2026.

Each warehouse includes garage doors, bathrooms, communications rooms and heating systems designed to keep the facilities above freezing during winter. Fire protection features include sprinkler systems, interior firefighting hoses, fire hydrants and full fire alarm systems. The facilities also incorporate photovoltaic solar power generation and infrastructure designed to support future remote monitoring capabilities.

“The warehouse operations will be a lot more streamlined,” said Aarons. “It’ll cut down on the time it takes to get everything where it needs to be, making us more prepared and efficient.”

The new warehouses add another layer of infrastructure and resiliency to Aviano Air Base, helping Airmen maintain the equipment and resources necessary to restore airfield operations following damage if the need arises.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

Breaking News From Italy

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.